Old Road To Nine Acre Corner

Project:
2017 Roads Program 

Town Contact for Roadway and Drainage Related Matters:
Jacob Zwicker, Assistant Public Works Engineer, Engineering Division 978-318-3210, jzwicker@concordma.gov

General Contractor (Roadway work):
Lazaro Paving Corp.

Sub-Contractor (Drainage work):
James Fenton & Son Contracting, Inc.

Program Background:
The goal of the Town’s annual roads program is to recommend adequate investment in the Town’s 107 mile roadway network to ensure the network does not deteriorate to a point which would result in more costly periodic repairs.  Utility improvement opportunities are also identified and implemented within the roads program when appropriate. This can include drainage replacements or enhancements, water main and sewer main replacements and/or private utility expansions from National Grid (gas main), Verizon (Broadband internet/cable), etc.

Project Overview:
Old Road to Nine Acre Corner is part of the 2017 Roads Program bid, which is valued at approximately $1,000,000.00. The project is scheduled to reconstruct 5.4 miles of roadway, reconstruct drainage as needed, and other incidental work.

Scope of Work:
This phase of the 2017 Roads Program will begin in the Fall of 2017, starting with the installation of the drainage infrastructure. In the Spring of 2018, Old Road to Nine Acre Corner is scheduled for a mill and overlay treatment. This involves the removal of the top course (1.5”) of pavement. Utility castings are then adjusted in addition to other incidental work in preparation for installing 1.5” of new pavement. The reconstruction is then finalized by completing the remaining work which consists of line striping, loam & seeding disturbed roadway shoulders, blending driveway transitions (if necessary), and final clean-up.

12/5/2017 Update:
The Sub Contractor, Fenton and Sons, completed the installation of the drainage infrastructure along ORNAC. The Contractor, Lazaro Paving, paved the trench for winter shutdown. Work will recommence Spring of 2018.

Construction Schedule - To be updated Spring 2018