Phase 2C Design Plans

  1. Phase 2C 100% Design Plans

    The Plan Set for the 100% design plans of the Bruce Freeman Rail Trail is Posted for your information and convenience is the cover sheet that lists all plans in the plan set.

  2. Phase 2C 75% Design Plan

    Posted for your information and convenience is the cover sheet that lists all plans in the plan set and the 32 sheets showing the site plan and profiles for the length of the Trail in Concord from Commonwealth Avenue.

  3. BFRT Phase 2C Concord FAQ's Nov. 2016