Roads and Sidewalk Program
updated 6/17/14
 2013-2014 Roads Program -

This is the List of Roads to be treated in the 2013-2014 Roads Program:

Street Segment
Treatment
L(Ft)
Powder Mill Rd (Stone Root Ln - Old Pickard)*
Reclaim/Prep & Overlay - A/C
2160
Allen Farm Lane
Reclaim & Pave - Local
1540
Elm St (Main St. to Bridge)
Prep & Overlay - A/C
1195
Gifford Lane
Reclaim & Pave - Local
975
Baker Ave**
Reclaim/Prep & Overlay - A/C
1950
Saw Mill Rd.
Reclaim & Pave - Local
690
Crescent Rd.
Reclaim & Pave - Local
1730
Garland Rd.
Reclaim & Pave - Local
680
Wilson Rd.
Prep & Overlay - Local
1085
Nashoba Rd (360' E of Garland to Cul-de-Sac)***
Reclaim/Prep & Overlay - Local
1720
Caterina Heights
Prep & Overlay - Local
4295
Hosmer Rd.
Reclaim & Pave - Local
710
Fitchburg Tpk. (Rte. 117)
Mill & Overlay - A/C
3175
*POWDER MILL RD HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
STONE ROOT LN. to 441' W OF STONE ROOT LN. & 670' E OLD PICKARD RD. to OLD PICKARD RD.
PREP AND OVERLAY AREA:
441' W OF STONE ROOT LN. to 670' E OF OLD PICKARD LN.
**BAKER AVE HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
GIFFORD LN. THROUGH CUL-DE-SAC
PREP AND OVERLAY AREA:
ELM ST to GIFFORD LN
***NASHOBA ROAD HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
WILSON RD THROUGH CUL-DE-SAC
PREP AND OVERLAY AREA:
300'E OF GARLAND to WILSON RD
NOTE
APPROXIMATELY 1.4 MILES OF CAMBRIDGE TURNPIKE WILL BE TREATED
WITH RECLAIM & PAVE - A/C FROM LEXINGTON RD to RTE. 2

Update as of 6/17/14

  • 2013/2014 Roads Program – (This information is subject to weather and other circumstances that may affect the schedule)
Week of June 16th

·       Erosion Control on Elm Street was installed today.

·       Sub-contractor Perkins will commence with drainage improvements on Elm St. on Wed. 6/18.  The improvements will begin at the down stream end near the bridge over the Sudbury and continue towards Main St

Week of June 23rd

·       Perkins will complete the drainage replacement on Elm St.

·        Contractor, Lazaro, will patch Elm St drainage areas in preparation for paving.

Week of June 30th

·       Lazaro, will re-commence with roadway reconstruction by cold milling Elm Street/Sections of Nashoba Rd and Baker Ave

·       Lazaro will install curb ramps, R&R Curbing in the Baker Neighborhood.

·       Lazaro will adjust/raise utility castings in the Crescent/Baker Neighborhoods  and on Elm Street

Week of July 7th

·       Lazaro will pave  the top course in the  Baker/ Crescent Neighborhoods first.

·       Lazaro will then pave the top course on Elm St.

Update as of 6/9/14
  • 2014/2015 Roads Program – CPW’s Engineering Division began work on the designs/plans for the 2014/2015 Roads Program.~ The current plan includes reclaim treatments on Seven Star Lane, Powder Mill Road (Sudbury Road to Plainfield Road) and Belknap Street (RR to Thoreau St & Thoreau Street to Main Street); mill and overlay treatments on Old Bedford Road, Spencer Brook Road (Town Line to Westford Road), Barnes Hill Road (Lowell Road to Estabrook Road), Estabrook Road (Cedar Way to Barnes Hill Road), Lowell Road (Barrett’s Mill Road to Hugh Cargill Road), Commonwealth Avenue, and patch replacement on Farmer’s Cliff Road; finally, an overlay treatment on an 800’ section of Bedford Street will round out the Program’s scope.
CPW’s Engineering Division staff has completed the in-house ground survey and base plan development for the reclaim streets listed above. Neighborhood outreach meetings were conducted in early April and the project was also presented at the April PWC hearing. CPW’s Engineering Division staff also completed pavement coring and sub base testing. Tentative plans are to advance the design in July for a bid in August.  Once a contractor has been selected a definitive construction schedule will be established and residents will be notified again.  The division is expecting to start re-construction in the late summer and continue as late into the fall as weather permits.  Any outstanding work will be completed the following summer.  Historically, the roads program is approximately a full calendar year from commencement to final completion.

You may contact the Engineering Division at 978-318-3210 with any questions.


 