As part of the 2022 Road Improvement Project, Engineering staff advertised three (3) separate contracts listed below:
- Phase I - pavement preservation with asphalt rubber
- Phase II - pavement preservation and rehabilitation that includes fog sealing, microsurfacing, and cold in-place recycling
- Phase III - pavement reconstruction that includes full depth reconstruction and milling and overlay
Bids for Phase I opened on March 2, 2022. Engineering staff analyzed the bid tenders and recommended the contract be awarded to All States Construction Inc. The Engineering staff is currently working with the Town House and the Contractor to get the Phase I contract executed. Construction is anticipated to begin at the end of the month of April 2022.
Bids for Phase II opened on March 31, 2022. Engineering staff is currently analyzing the bid tenders. A decision of award on this bid package will be made within the next two weeks.
Engineering staff has requested bids for Phase III on March 25, 2022, and the bid opening is scheduled for April 22, 2022. If the bid process is successful, construction is anticipated to begin in May 2022.
The three phase of the 2022 Roads Improvement Program will include the following streets and treatments.
Roads chosen for Rehabilitation
Street Name | From Street Name | To Street Name | Planned Repair Method |
Alford Ci | Mattison Dr. | Cul-De-Sac Loop | RECONSTRUCTION |
Autumn Ln | Lincoln Town line | Cul-De-Sac Loop | RECONSTRUCTION |
Ayrshire Ln | Mattison Dr. | Cul-De-Sac Loop | RECONSTRUCTION |
Mattison Dr. | Williams Rd | Mattison Dr. | RECONSTRUCTION |
Old Mill Rd | Harrington Av | Range Rd | RECONSTRUCTION |
Stacey Cir | Old Mill Rd | Cul-De-Sac Loop | RECONSTRUCTION |
Alden Rd | Plainfield Rd | Cul-De-Sac Loop | RECONSTRUCTION |
Anson Rd | Alden Rd | Plainfield Rd | RECONSTRUCTION |
Raymond Rd | Plainfield Rd | Cul-De-Sac Loop | RECONSTRUCTION |
Pheasant Ln | Lincoln Town Line | Cul-De-Sac Loop | RECONSTRUCTION |
Commonwealth Av | Church St | Laws Brook Rd | RECONSTRUCTION |
*Bradford St | Commonwealth Av | Dead End | MILL AND OVERLAY |
*Coolidge Rd | Main St | Oak Rd | MILL AND OVERLAY |
*Davis Ct | Bedford St | Dead End | MILL AND OVERLAY |
+Florio Dr. | Main St | Cul-De-Sac Loop | MILL AND OVERLAY |
Macmillan Dr. | Mattison Dr. | Cul-De-Sac Loop | MILL AND OVERLAY |
Monument | Sawmill Brook | 150' North | MILL AND OVERLAY |
+Pine St | Main St | Cold Seam | MILL AND OVERLAY |
*ORNAC | Sudbury Rd | Williams Rd | MILL AND OVERLAY |
*Winthrop St | Commonwealth Av | End | MILL AND OVERLAY |
*Locations postponed to next year due to National Grid main replacement not yet completed
+Locations also postponed to next year due to their completed proximity to the above locations
Roads chosen for Preservation Techniques:
Street Name | From Street Name | To Street Name | Planned Repair Method |
Annursnac Hill Rd | College Rd | Annursnac Hill | ASPHALT RUBBER |
Annursnac Hill Rd | Strawberry Hill Rd | College Rd | ASPHALT RUBBER |
Farmer's Cliff | Lowell Rd | Cul-De-Sac | ASPHALT RUBBER |
Barretts Mill Rd | Rt 2 | College Road | ASPHALT RUBBER |
College Rd | Annursac Hill | Barretts Mill Rd | ASPHALT RUBBER |
Hildreth Ln | Lowell Rd | Cul-De-Sac | Cape Seal (Asphalt Rubber + Microsurfacing) |
Prairie St | Dead End | Chase Rd | MICROSURFACING |
Prairie St | Main St | Brown St | MICROSURFACING |
Wright Rd | Laws Brook Rd | Cul-De-Sac Loop | MICROSURFACING |