Concord Light - Comm Charging Station Rebate - Program Requirements

1
    • Applicant will apply for all necessary permits and approvals.
    • The charging station(s) will be installed on a new, separate meter. The new meter must be connected line-side to CMLP’s distribution system, meaning that the new meter cannot be sub-metered to the customer’s existing meter on the load side. Electricians wishing to consult with CMLP regarding the point of utility connection and/or meter location for the EV charging station should contact CMLP’s Engineering Division at cmlpengineering@concordma.gov or 978-318-3116.
    • The electric account holder will pay CMLP for the electricity recorded on the new meter pursuant to the G-4 General Service - Electric Vehicle Charging tariff.
    • The Commercial EV Charging Station Rebate Pre-Approval Request Form requires applicants to provide details about charging station user fees for non-fleet users and about availability for all users. CMLP's Commercial EV Specialists will review the details and advise on best practices. However, decisions about charging station availability and user fees are ultimately up to the station owner. 
    • The station must be installed at or near dedicated parking space(s) with appropriate signage to indicate that it is for EV charging only. 
    • Any electrical work needed to install a charging system must be done by a licensed electrician under an electrical permit issued by the Town and must pass inspection by the Town’s Electrical Inspector.
    • Applicants who previously received a commercial charging station rebate are eligible to receive subsequent rebates for additional stations if existing charging station data show greater than 50% utilization on a 24/7 basis. Station owners are responsible for driving up usage of the station outside of business hours. For example, they may promote usage of the station to nearby multi-dwelling unit (MDU) property residents who do not have on-site charging facilities. 
    • In order to be eligible for a rebate, applicants must request rebate pre-approval and receive a rebate award letter from CMLP prior to installation. See the section below entitled, “How to Request Rebate Pre-Approval Before Installation.”
    • The charging station must be installed and operational within 6 months of the award letter issue date. Extensions for extenuating circumstances will be considered.
    Concord Light - Comm Charging Station Rebate - Program Requirements
The Town of Concord Massachusetts

Site Tools

Share

Contact Us

  1. Town of Concord

    22 Monument Square
    Concord, MA 01742

    Hours

    Monday-Thursday
    8:30 am-4:30 pm

    Friday
    8:30 am-12:30 pm

    Phone:

    978-318-3100

    Email:

    publicinfo@concordma.gov

Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow